Used Self Erect Cranes Downey - Typically the base which is bolted into a huge concrete pad provides the crucial support for a tower crane. The base is connected to a mast or a tower and stabilizes the crane that is connected to the inside of the structure of the building. Normally, this attachment point is to a concrete lift or to an elevator shaft.
Typically, the mast is a triangulated lattice structure measuring 10 feet square or 0.9m2. The slewing unit is attached to the very top of the mast. The slewing unit consists of a motor and a gear that enable the crane to rotate.
Tower cranes are able to have a maximum unsupported height of eighty meters or 265 feet. The maximum lifting capacity of a tower crane is sixteen thousand six hundred forty two kg or 39,690 lbs. with counter weights of twenty tons. Additionally, two limit switches are used to be able to make certain that the operator does not overload the crane. There is also one more safety feature known as a load moment switch to make certain that the driver does not surpass the ton meter load rating. Last of all, the tower crane has a maximum reach of seventy meters or 230 feet.
Due to their extreme heights, there is a science involved to erecting a crane. The stationary structure will first need to be brought to the construction location by utilizing a huge tractor-trailer rig setup. Next, a mobile crane is used so as to assemble the machine part of the crane and the jib. These parts are then connected to the mast. The mobile crane next adds counterweights. Forklifts and crawler cranes may be a few of the other industrial machinery which is utilized to erect a crane.
Mast extensions are added to the crane when the building is erected. This is how the height of the crane can match the building's height. The crane crew utilizes what is referred to as a top climber or a climbing frame that fits between the top of the mast and the slewing unit. A weight is hung on the jib by the work crew in order to balance the counterweight. When complete, the slewing unit can detach from the top of the mast. In the top climber, hydraulic rams are utilized to adjust the slewing unit up an additional 20 feet or 6.1m. After that, the driver of the crane uses the crane to insert and bolt into place one more mast part piece.